Concrete & Asphalt Removal Contractor in Colorado

When your cracked driveway, failed slab, or obsolete parking lot stands between you and new construction, Rocky Demolition brings the right machines and methodical plan to break, saw-cut, haul, and recycle it fast—safely and to code, every time. From residential tear-outs to big-box parking lots, our team turns solid concrete into reusable base while keeping your neighbors happy and inspectors satisfied.

Quick Facts

  
We RemoveDriveways • Garage slabs • Sidewalks • Patios • Parking lots • Retaining walls • Curbs
MethodsSaw-cutting • Breaker hammers • Skid steers • On-site crushing
Recycling Rate85–98% concrete / asphalt reused
ServingDenver • Aurora • Arvada • Colorado Springs + all Colorado
Free Quote📞 Call 720-442-1092 or Request Here

What Is Concrete & Asphalt Removal?

Concrete & asphalt removal means the controlled break-up, lift-out, haul-off, and safe disposal or recycling of hardened slabs, paved areas, or footings—all done with specialized machines and dust or water controls.

When You Need This Service

ScenarioExample
Residential upgradeCracked driveway, failed garage slab
New constructionDemo old footings before pouring new pad
Commercial redevelopmentTear out strip-mall lot for new parking layout
Infrastructure workSidewalk replacement, city road widenings
Hazard removalTrip hazards, code fines, storm drain issues

How We Remove Concrete: Step-By-Step

StepWhat We DoWhy It Matters
1. Inspect & LocateMark utilities (811), flag sub-surface pipesAvoid service damage & fines
2. Saw-Cut or ScoreUse walk-behind saw to clean edges, expansion jointsKeeps slab edges neat, no overbreak
3. Break & PopUse breaker hammer or hoe ram to fracture slabControlled breakage protects base if kept
4. Load-OutSkid steer or excavator lifts sections to roll-offFaster, safer than hand loading
5. Crush or HaulSend to recycler or crush on-site if allowedReuse as Class 6 base = saves fill costs
6. Final Grade & SweepRake, compact if needed, magnet sweep nails/metalReady for next contractor or fresh pour

Specialized Equipment We Bring

ToolFunction
Hydraulic breaker hammer500–3,000 ft-lb for thick slabs
Concrete saw (wet-cut)Straight expansion cuts; silica-safe
Skid steer & grapple bucketPop & load big chunks fast
On-site crusherTurns old concrete into road base
Vacuum & water controlOSHA silica table 1 compliance
Roll-off containerKeeps site tidy & safe

Cost Drivers & Budget Benchmarks

FactorLowHigh
Size & Thickness4″ patio12″ footing, rebar mesh
AccessCurbsideTight backyard, fence remove
Haul DistanceLocal recyclerRemote site, landfill only
Slab ReinforcementPlain pourWire mesh & rebar cage
On-Site Crush vs HaulCrusher saves haul feesSmall jobs: no crusher = full haul

Ballpark:
• Small patio (200 sf): $800–$1,500
• Driveway (500 sf): $2,500–$5,000
• Parking lot (5,000 sf): $1.50–$3 / sf

We provide fixed-price quotes after a site walk.

Permits & Compliance

CityPermitSpecial Note
DenverROW if sidewalk/driveTraffic control plan if curb cuts
AuroraDriveway or approachErosion BMP needed if grading
ArvadaStormwater ordinanceSilt fence if soil exposed
StatewideHauling regulationsCovered loads, legal weight

Bonus: We handle all CDPHE silica rules, haul tickets, and disposal manifests.

Recycling & Sustainability

MaterialOutcome
Concrete¾″ Class 6 base for driveways, roads
AsphaltReclaimed for hot-mix or cold patch
Metal mesh/rebarSold to local scrap yard
Dirt/fillUsed for rough grading if clean

Most jobs divert 85–98% from landfills — so your project ticks city green-code boxes.

Recent Project Snapshot

Example: 2-car driveway in Aurora
480 sf @ 5″ thick, rebar mesh
• Saw-cut edges, breaker hammer, mini-ex haul
• All concrete crushed on-site = 10 tons Class 6
• Backfilled and compacted for new pour base
• Timeline: 1 day removal, next day ready

Why Rocky Demolition?

✅ 25+ years heavy-equipment mastery
✅ OSHA silica-safe controls
✅ On-site crush = save fill import cost
✅ Fully insured, licensed, bonded
✅ Fast quotes, polite crews, perfect site cleanup

FAQs

Q: Can I keep my base and pour over it?
Sometimes. If old base is stable and slab cracked only top-down, we can break & remove just the top pour.

Q: Do I need a permit?
Usually yes if you touch public curb, sidewalk, or road. Private driveways may not need city sign-off if inside lot line.

Q: How fast can you do it?
Small driveways/patios: 1 day. Bigger lots: 2–3 days with haul and rough grade same day.